t1/2 prior to Tmax in BE study [NCA / SHAM]

posted by Dhruv Shah – India, 2016-03-11 04:48 (2965 d 17:18 ago) – Posting: # 16088
Views: 5,651

In a recent BE study I observed that t1/2 (1 hrs) was faster than Tmax (1.3 hrs). I wanted to know that what does it mean? Moreover if we analyze the data of individual subjects, the occurrence was more in test as compared to reference product. Do we need any special design precautions in such study?


Edit: Category changed. Please follow the Forum’s Policy[Helmut]

Complete thread:

UA Flag
Activity
 Admin contact
22,993 posts in 4,828 threads, 1,654 registered users;
66 visitors (0 registered, 66 guests [including 2 identified bots]).
Forum time: 23:06 CEST (Europe/Vienna)

If you don’t like something change it;
if you can’t change it, change the way you think about it.    Mary Engelbreit

The Bioequivalence and Bioavailability Forum is hosted by
BEBAC Ing. Helmut Schütz
HTML5