Assumptions (plural) [Design Issues]
Hi Achievwin,
❝ How come we have three different N with same assumptions?
- Uncertain CV → n = 28
- Uncertain T/R-ratio → n = 44
- Uncertain CV and uncertain T/R-ratio → n = 48
m
). The smaller, the larger the sample size of the next. Therefore, small pilot studies are not a good idea. It may sound stupid, but the best for sample size estimation is a failed pivotal study… —
Dif-tor heh smusma 🖖🏼 Довге життя Україна!
Helmut Schütz
The quality of responses received is directly proportional to the quality of the question asked. 🚮
Science Quotes
Dif-tor heh smusma 🖖🏼 Довге життя Україна!
Helmut Schütz
The quality of responses received is directly proportional to the quality of the question asked. 🚮
Science Quotes
Complete thread:
- Probability of Success in BE studies Achievwin 2024-05-03 13:43 [Design Issues]
- Probability of Success in BE studies Helmut 2024-05-03 14:15
- Probability of Success in BE studies Achievwin 2024-05-06 14:49
- Probability of Success in BE studies d_labes 2024-05-06 15:16
- Probability of Success in BE studies Achievwin 2024-05-06 15:31
- Assumptions (plural)Helmut 2024-05-06 15:31
- Assumptions (plural) Achievwin 2024-05-06 15:51
- Probability of Success in BE studies d_labes 2024-05-06 15:16
- Probability of Success in BE studies Achievwin 2024-05-06 14:49
- Probability of Success in BE studies Helmut 2024-05-03 14:15