Software validation [NCA / SHAM]

posted by jag009  – NJ, 2016-01-29 23:46 (2981 d 00:53 ago) – Posting: # 15897
Views: 6,334

Hi Helmut,

Remember I told you about one lab which would consider Kel as "could not be evaluated" if the last timepoint(s) jumps back up relative to the rest of the points before them in the elimination phase?

John

Complete thread:

UA Flag
Activity
 Admin contact
22,957 posts in 4,819 threads, 1,636 registered users;
60 visitors (0 registered, 60 guests [including 12 identified bots]).
Forum time: 00:39 CET (Europe/Vienna)

Nothing shows a lack of mathematical education more
than an overly precise calculation.    Carl Friedrich Gauß

The Bioequivalence and Bioavailability Forum is hosted by
BEBAC Ing. Helmut Schütz
HTML5