CR? [Regulatives / Guidelines]
Hi Helmut,
A long long time ago (2000s) in my previous life we were developing a generic of a DR product which is designed to be given in the evening to have morning effect. The drug has a specific Tlag which FDA required us to meet in addition to BE criteria.
John
❝ Yep. Luv nonparametrics. What do you mean by “we had to show that Tlag was not significantly different …”? In the US? Surprise.
A long long time ago (2000s) in my previous life we were developing a generic of a DR product which is designed to be given in the evening to have morning effect. The drug has a specific Tlag which FDA required us to meet in addition to BE criteria.
John
Complete thread:
- Tmax differences in BE studies jag009 2012-10-15 16:23
- Delayed release? Helmut 2012-10-15 16:41
- Delayed release? jag009 2012-10-15 19:38
- Delayed release? Helmut 2012-10-15 16:41
