Hello Tina,
A 10.3 application is not a good way forward for you. Your problem is that it is easily argued that bioavailability studies are 'appropriate' (check the exact wording in 10.1 and 10.2). If you submit as 10.3 then you should provide preclinical tests or clinical trials so you would need to argue that your PK was a good surrogate for clinical trials which in itself would likely speak against a shift from 10.1/10.2 to 10.3.
I'd be interested to hear how the fasted study failed. Was the CI completely outside the acceptance range? If it was then you are in my opinion close to gameover. If there is a partial overlap you might be in a situation where you could justify another trial depending on the details.
❝ I am currently working on an IR generic product.The reference comparator SPC mentions no information of PK differences and meals. SD fed and fasted study was conducted for EU submission. The fasted study failed while the fed study passed. Though the product was developed as a generic 10(1), can the difference observed in the result be submitted as hybrid generic application and have specific wording in the SPC for taking the generic developed product with or after meals? Is this option acceptable?
A 10.3 application is not a good way forward for you. Your problem is that it is easily argued that bioavailability studies are 'appropriate' (check the exact wording in 10.1 and 10.2). If you submit as 10.3 then you should provide preclinical tests or clinical trials so you would need to argue that your PK was a good surrogate for clinical trials which in itself would likely speak against a shift from 10.1/10.2 to 10.3.
I'd be interested to hear how the fasted study failed. Was the CI completely outside the acceptance range? If it was then you are in my opinion close to gameover. If there is a partial overlap you might be in a situation where you could justify another trial depending on the details.
—
Pass or fail!
ElMaestro
Pass or fail!
ElMaestro
Complete thread:
- §10(1) TO 10(3) shift due to altered BE results Tina 2013-05-24 18:02
- §10(1) TO 10(3) shift due to altered BE resultsElMaestro 2013-05-24 18:15
- §10(1) TO 10(3) shift due to altered BE results Shuanghe 2013-05-27 15:47