BE parallel design [Study Assessment]
Dear Sathya,
The 90% CI is built around the point estimate ! You will always have lower < point estimate < upper.
The only criterion to consider is 80 < lower and upper < 125.
Regards
Ohlbe
The 90% CI is built around the point estimate ! You will always have lower < point estimate < upper.
The only criterion to consider is 80 < lower and upper < 125.
Regards
Ohlbe
Complete thread:
- BE parallel design Sathya 2008-09-06 06:46
- BE parallel designOhlbe 2008-09-06 16:48
- BE parallel design Sathya 2008-09-08 03:24
- BE parallel design Sathya 2008-09-08 09:12
- a posteriori power... Jaime_R 2008-09-08 10:46
- a posteriori power... Sathya 2008-09-08 11:51
- a posteriori power... Ohlbe 2008-09-08 12:27
- a posteriori power... Sathya 2008-09-10 09:49
- a posteriori power... Ohlbe 2008-09-08 12:27
- a posteriori power... Sathya 2008-09-08 11:51
- a posteriori power... Jaime_R 2008-09-08 10:46
- BE parallel designOhlbe 2008-09-06 16:48