BE study with two different batches of the reference product [Study As­sess­ment]

posted by tarak_desai – India, 2014-12-16 07:51 (4207 d 08:12 ago) – Posting: # 14076
Views: 12,660

Hello to all,

Need your guidance on following case.

In a two period, single dose, cross over, BE study, it was observd that after completion of period-I, there was insufficient quantity of the reference product available to dose subjects in period-II. sponsor also doesnt have same batch reference product availalbe with them.

can we use the different batch reference product in priod-II?
and what other measures to be taken in this case?
or redosing to be done using same batch in period-I and II or do we need to cancel study?

pls guide.

thanks.
tarak


Edit: Category changed. [Helmut]

Complete thread:

UA Flag
Activity
 Admin contact
23,655 posts in 4,993 threads, 1,571 registered users;
144 visitors (0 registered, 144 guests [including 13 identified bots]).
Forum time: 17:04 CEST (Europe/Vienna)

Competence, like truth, beauty and contact lenses,
is in the eye of the beholder.    Laurence J. Peter

The Bioequivalence and Bioavailability Forum is hosted by
BEBAC Ing. Helmut Schütz
HTML5