Simulations [Two-Stage / GS Designs]

posted by Helmut Homepage – Vienna, Austria, 2013-10-22 15:20 (4262 d 02:19 ago) – Posting: # 11726
Views: 26,159

Hi Kumar,

❝ can you please guide me how you have calculated the power above so that from next time I can do this exercise for two stage design.


My simulations were done in R using package PowerTOST. Set up the frame­work (decision scheme, alphas in both stages, acceptance rule) and generate N BE-studies of n1 sample sizes with the expected CV. For Potvin use a T/R-ratio of 1.25 (for alpha) or 0.95 (for power). Simulate N=106 studies for alpha (slow convergence) and at least N=105 studies for power. Number of studies passing / N at 1.25 = empiric alpha and at 0.95 = empiric power.
Depending on your CPU and programming skills expect run-times of 15 seconds up to one day for 106 sim’s. :-D

Dif-tor heh smusma 🖖🏼 Довге життя Україна! [image]
Helmut Schütz
[image]

The quality of responses received is directly proportional to the quality of the question asked. 🚮
Science Quotes

Complete thread:

UA Flag
Activity
 Admin contact
23,424 posts in 4,927 threads, 1,673 registered users;
34 visitors (0 registered, 34 guests [including 19 identified bots]).
Forum time: 17:39 CEST (Europe/Vienna)

Reach for the stars,
even if you have to stand on a cactus.    Susan Longacre

The Bioequivalence and Bioavailability Forum is hosted by
BEBAC Ing. Helmut Schütz
HTML5