Regarding completion of period from a subject [GxP / QC / QA]

posted by vivekanand – India, 2012-11-16 12:47 (4957 d 04:58 ago) – Posting: # 9539
Views: 5,817

Dear All

In a BA/BE study,when can we consider the subject not completed period in following cases
  1. If a subject after dosing with drawn from a study in period-01 before check-out (in house stay). Then he/she shall be considered as period-not completed -is this yes/no.
  2. If a subject is with drawan from the study during wasout period of drug or during ambulatory sample visits for any AE.Then he/she shall be considered as period-not completed (for the period which they were dosed) -is this yes/no.

Regards
G.Balavivekanand

Complete thread:

UA Flag
Activity
 Admin contact
23,653 posts in 4,991 threads, 1,570 registered users;
95 visitors (0 registered, 95 guests [including 22 identified bots]).
Forum time: 18:46 CEST (Europe/Vienna)

To propose that poor design can be corrected by subtle analysis techniques
is contrary to good scientific thinking.    Stuart J. Pocock

The Bioequivalence and Bioavailability Forum is hosted by
BEBAC Ing. Helmut Schütz
HTML5