Pilot BE Study (GMP requirement) [GxP / QC / QA]

posted by Helmut Homepage – Vienna, Austria, 2012-07-09 18:01 (5087 d 05:52 ago) – Posting: # 8912
Views: 12,275

Dear BKumar!

❝ it is necessary to follow GMP during manufacturing finished dosage form for conducting pivotal BE studies.


Yes. See EMA’s GL (2010):

❝ do we need to manufacture the pilot batch too under GMP conditions for using in the pilot BE study?


Not sure what you mean here. Are you referring to a kind of ‘experimental’ (lab-size) batch before upscaling? I would not do that. One rationale of a pilot study is to get estimates of the T/R-ratio and the CVintra – which can be totally different from a GMP-compliant production batch.

❝ what are the guidelines recommends in this regards?


See above.

Dif-tor heh smusma 🖖🏼 Довге життя Україна! [image]
Helmut Schütz
[image]

The quality of responses received is directly proportional to the quality of the question asked. 🚮
Science Quotes

Complete thread:

UA Flag
Activity
 Admin contact
23,653 posts in 4,991 threads, 1,570 registered users;
103 visitors (0 registered, 103 guests [including 14 identified bots]).
Forum time: 23:53 CEST (Europe/Vienna)

To propose that poor design can be corrected by subtle analysis techniques
is contrary to good scientific thinking.    Stuart J. Pocock

The Bioequivalence and Bioavailability Forum is hosted by
BEBAC Ing. Helmut Schütz
HTML5