t1/2 prior to Tmax in BE study [NCA / SHAM]

posted by Dhruv Shah – India, 2016-03-11 04:48 (2967 d 04:27 ago) – Posting: # 16088
Views: 5,656

In a recent BE study I observed that t1/2 (1 hrs) was faster than Tmax (1.3 hrs). I wanted to know that what does it mean? Moreover if we analyze the data of individual subjects, the occurrence was more in test as compared to reference product. Do we need any special design precautions in such study?


Edit: Category changed. Please follow the Forum’s Policy[Helmut]

Complete thread:

UA Flag
Activity
 Admin contact
22,993 posts in 4,828 threads, 1,656 registered users;
100 visitors (0 registered, 100 guests [including 2 identified bots]).
Forum time: 10:15 CEST (Europe/Vienna)

Never never never never use Excel.
Not even for calculation of arithmetic means.    Martin Wolfsegger

The Bioequivalence and Bioavailability Forum is hosted by
BEBAC Ing. Helmut Schütz
HTML5